340
DTC
DTC Bus Route 340: Kendriya Terminal (Pt. Pant Marg) → Nand Nagari Terminal
42 stops
Est. ~1h 24m travel time
Return JourneyReturn: Nand Nagari Terminal → KENDRIYA TERMINAL / Gurudwara Rakab Gunj
Timetable
Departure times from Kendriya Terminal (Pt. Pant Marg).
Service hours: 8:15 AM – 10:35 PM
Peak: Every 5–75 min (8–10 AM, 5–7 PM)
Off-peak: Every 5–75 min
18 trips/day
Morning (5 AM – 12 PM)
8:15 AM
8:35 AM
9:50 AM
9:55 AM
10:10 AM
10:35 AM
11:50 AM
Afternoon (12 – 5 PM)
12:15 PM
1:30 PM
1:35 PM
1:50 PM
2:15 PM
4:55 PM
Evening (5 – 11 PM)
6:15 PM
6:55 PM
8:35 PM
9:55 PM
10:35 PM
Related routes
Other buses connecting Kendriya Terminal (Pt. Pant Marg) or Nand Nagari Terminal.
120B
Kendriya Terminal (Pt. Pant Marg)
Ghoga Village
210
Kendriya Terminal (Pt. Pant Marg)
Harsh Vihar Terminal
212
Anand Parvat Terminal
Nand Nagari Terminal
235
Wazirpur JJ Colony
Nand Nagari Terminal
241
Shivaji Stadium Terminal ( Connaught Place )
Nand Nagari Terminal
260
Kendriya Terminal (Pt. Pant Marg)
C-Block Yamuna Vihar / C4 YAMUNA VIHAR TERMINAL
261
Sarai Kale Khan ISBT
Nand Nagari Terminal
270
Kendriya Terminal (Pt. Pant Marg)
Karawal Nagar Terminal
About 340 bus route
Bus route 340 is a DTC service running between Kendriya Terminal (Pt. Pant Marg) and Nand Nagari Terminal. The route covers 42 stops with an estimated travel time of 84 minutes end-to-end.
This bus operates 18 trips daily, with the first departure at 8:15 AM and the last at 10:35 PM. During peak hours (8–10 AM, 5–7 PM), buses come every 5–75 minutes.
The 340 route passes through key stops that connect to the Delhi Metro network and other DTC/Cluster bus routes. Check individual stop pages above for metro connections and interchange options.
Frequently asked questions
What is the route of bus 340 in Delhi?
Bus 340 runs from Kendriya Terminal (Pt. Pant Marg) to Nand Nagari Terminal, covering 42 stops. It is operated by DTC (Delhi Transport Corporation).
What is the timing of bus 340?
Bus 340 operates from 8:15 AM to 10:35 PM with 18 trips daily. Peak hour frequency is every 5–75 minutes.
How many stops does bus 340 have?
Bus 340 has 42 stops between Kendriya Terminal (Pt. Pant Marg) and Nand Nagari Terminal. The total journey takes approximately 84 minutes.
Does bus 340 go in both directions?
Yes, bus 340 operates in both directions. The reverse route goes from Nand Nagari Terminal to Kendriya Terminal (Pt. Pant Marg).