DTC Bus Routes Get it on Google Play
Home Routes 259

Timetable

Departure times from E Block Jahangir Puri Terminal.

Service hours: 5:00 AM9:30 PM Peak: Every 1–36 min (8–10 AM, 5–7 PM) Off-peak: Every 3–60 min 57 trips/day

Related routes

Other buses connecting E Block Jahangir Puri Terminal or Harsh Vihar Terminal.

Browse all

About 259 bus route

Bus route 259 is a DTC service running between E Block Jahangir Puri Terminal and Harsh Vihar Terminal. The route covers 39 stops with an estimated travel time of 78 minutes end-to-end.

This bus operates 57 trips daily, with the first departure at 5:00 AM and the last at 9:30 PM. During peak hours (8–10 AM, 5–7 PM), buses come every 1–36 minutes.

The 259 route passes through key stops that connect to the Delhi Metro network and other DTC/Cluster bus routes. Check individual stop pages above for metro connections and interchange options.

Frequently asked questions

What is the route of bus 259 in Delhi?
Bus 259 runs from E Block Jahangir Puri Terminal to Harsh Vihar Terminal, covering 39 stops. It is operated by DTC (Delhi Transport Corporation).
What is the timing of bus 259?
Bus 259 operates from 5:00 AM to 9:30 PM with 57 trips daily. Peak hour frequency is every 1–36 minutes.
How many stops does bus 259 have?
Bus 259 has 39 stops between E Block Jahangir Puri Terminal and Harsh Vihar Terminal. The total journey takes approximately 78 minutes.
Does bus 259 go in both directions?
Yes, bus 259 operates in both directions. The reverse route goes from Harsh Vihar Terminal to E Block Jahangir Puri Terminal.